AMC project
Replacement of dedusting pipelines
AMC dismantled three existing dedusting pipelines and installed three new pipe sections with coordinated dual-crane lifts.
Project record
Project approach and delivery.
During this industrial replacement project, three large pipe sections were carefully dismantled and removed. The new dedusting pipelines were then positioned, lifted and connected to the existing installation using two cranes. The work required precise lift planning, intensive site coordination and safe assembly between the surrounding steel structures and process lines.
122 original project imagesProject phase
Demolishing works
Controlled dismantling and lifting of the three existing pipe sections.
Pipe 2
00:32Pipe 3
00:30Pipe 1
20 imagesPipe 2
16 imagesPipe 3
15 imagesProject phase
New installation
Positioning, lifting and connecting the three new dedusting pipelines.
Pipe 1
00:38Pipe 2
00:48Pipe 3
00:56Pipe 1
19 imagesPipe 2
24 imagesPipe 3