Replacement of dedusting pipelines

AMC dismantled three existing dedusting pipelines and installed three new pipe sections with coordinated dual-crane lifts.

Project record

Project approach and delivery.

Date01 November 2025IndustrySteel industryDeliveryFrom start to finish

During this industrial replacement project, three large pipe sections were carefully dismantled and removed. The new dedusting pipelines were then positioned, lifted and connected to the existing installation using two cranes. The work required precise lift planning, intensive site coordination and safe assembly between the surrounding steel structures and process lines.

122 original project images
01

Project phase

Demolishing works

Controlled dismantling and lifting of the three existing pipe sections.

51 images
01

Pipe 1

00:40
0:000:40
02

Pipe 2

00:32
0:000:32
03

Pipe 3

00:30
0:000:30
02

Project phase

New installation

Positioning, lifting and connecting the three new dedusting pipelines.

71 images
01

Pipe 1

00:38
0:000:38
02

Pipe 2

00:48
0:000:48
03

Pipe 3

00:56
0:000:56